Case Study

PP-R Pipe, Prototype Fusion Machine Leave Nothing to Chance at Spectacular New Hotel and Casino

PP-R Pipe, Prototype Fusion Machine Leave Nothing to Chance at Spectacular New Hotel and Casino

Pages 3 Pages

PROJECT: Seminole Hard Rock Hotel & Casino Heated and chilled water HVAC system, domestic water mains PRODUCTS: aquatherm blue pipe® aquatherm green pipe® LOCATION/DATE: Hollywood, FL 2017 - 2019 AQUATHERM ADVANTAGES: • The speed with which Aquatherm polypropylene- random (PP-R) pipe can be heat fused compared to welding steel was crucial on this project • The ability to fabricate piping assemblies and deliver them to the site allowed the contractor to maximize the amount of fusion work completed each day • The durability and longevity of PP-R pipe were key in a facility that is operational 24/7/365 Project meets demanding, fast-paced schedule to be ready for Super Bowl LIV O n a project as highly anticipated as the expansion of the Seminole Hard Rock Hotel & Casino i

Join for free to read