Case Study

Powering a Tra?c Monitoring System

Powering a Tra?c Monitoring System

Pages 1 Pages

Tra?c Monitoring Challenge To provide consistent power autonomy over a project area containing on-grid and o?-grid power. Systems must remain active during severe weather and power outages. Solution SunWize® Power Online, 60 watt battery charger, 108AH 12V battery The system solution is a grid-tied SunWize® Power Online consisting of a 60 watt battery charger and a 48-hour battery bank assembled in a standard aluminum pole mounted enclosure. This solution di?ers from traditional uninterruptible power supply (UPS) systems in that the SunWize® Power Online is outdoor rated for environmental extremes and power is always derived from the battery, so there is zero transfer time upon loss of utility power. The system required rapid design cycle and delivery time. The ability to leverage a standa

Join for free to read