Power Station, UK - Generator Transformer Acoustic Enclosure

Power Station, UK - Generator Transformer Acoustic Enclosure

Power Station, UK Project: UK Power Station Application Details: Power Station Generator Transformer Enclosure Supply Scope: Full acoustic enclosure approx. 14m long x 8.4 deep x 6m high complete with frame, walk on roof, galvanised access staircase and GRP handrailing to roof. Special Requirements: Due to the clients requirements for a quickly demountable construction in the event of equipment failure, the front wall and front roof section were designed as a large fully framed sections to assist with dismantling and re-assembly. The full internal structural frame of the enclosure ensured structural integrity of the housing during this potential partial removal. Product Selection and Performances: Typical enclosures designed to reduce noise levels to 65dB(A) at 1m based upon engine noise l