Case Study
Power Station Fly Ash System
Overview GAME were approached to design and manufacture an “S”-shaped, steep-angle, side- walled belt conveyor required to handle 140 tonnes per hour of fly ash and bed-bottom ash. Problem The conveyor was required to handle 140 tonnes per hour of fly ash and bed-bottom ash on a 1000mm wide belt at the ‘Vojany’ power station in Slovakia. In order for this large bulk conveyor to be transported safely and efficiently to Slovakia, it was su