Case Study

Power Plant Upgrades Control System

Power Plant Upgrades Control System

MAVERICK TECHNOLOGIES  CASE STUDY: UTILITY –POWER Power Plant Upgrades Control System  MAVERICK designed, configured, installed and commissioned a new redundant control system in  the demineralized water units of a power generating plant in the Houston area.    Main Objective    A Fortune 300 company selected MAVERICK to upgrade an existing Modicon 984 PLC control  system used to manage the operation of the overall water demineralization pr

Join for free to read