Case Study

Power Plant Reduces Maintenance and Energy Costs with Rosemount Main Steam Line Annubar Primary Element

Power Plant Reduces Maintenance and Energy Costs with Rosemount Main Steam Line Annubar Primary Element

Pages 2 Pages

Operations personnel are able to easily remove and reinsert Rosemount’s Main Stream Line Annubar from the steam line with minimal labor and without welding. POWER GENERATION ROSEMOUNT MAIN STEAM LINE ANNUBAR Rosemount Main Steam Line Annubar Power Plant Reduces Maintenance and Energy Costs with Rosemount TM Main Steam Line Annubar TM Primary Element RESULTS ? Decreased maintenance cost ? Reduced energy consumption ? Lowered risk of capital damage APPLICATION Return steam line flow CUSTOMER Power plant located in Europe CHALLENGE The coal-fired power plant faced a routine challenge in the preparation of a boiler blowdown. A successful blowdown removes impurities from the system to maintain high boiler efficiency and heat transfer capability. Preparation of a boiler blowdown was