Power Plant: Lime Slaker Heating Flow Rate: 80-110 GPM [22-30 m3/hr] Inlet Temperature: 33-75°F [1-24°C] Discharge Temperature: 80-95°F [27-35°C] Target Mix Temperature: 60°F [16°C] Water Inlet Pressure: 135 PSIG [9.3 barg] A power plant was looking to improve their lime slaking process for flue gas desulphurization and cleaning. They needed to: instantly meet and maintain precise temperature control for proper mixing of slurry, increase production with reduced cycle times, and reduce energy costs. SOLUTIONHydro-Thermal’s EZ Heater model H2020 EHS System was installed in this facility for the slaker water heating process. Installation of the unit has proven the inherent advantages of its design with: • Better product quality with precise temperature control • Instantaneous hot water o