Power Plant Converts Gray Water into Boiler Feedwater Using HERO™ Technology

Power Plant Converts Gray Water into Boiler Feedwater Using HERO™ Technology

Project Overview In 1999, Energía Azteca won the open bidding tendered by Mexico’s national electric utility, the Comisión Federal de Electricidad (CFE), to build Bajío in response to the increasing need for electric power required to support economic growth in Mexico’s central and northern regions. Bajio was built by Bechtel Power under a turnkey contract. There are limited water resources in this arid area. Ground water is not permitted