Power Generation Equipment
POWER GENERATION EQUIPMENT CASE STUDY Intermarine was responsible for ensuring a safe berth in Roatan. This involved numerous site visits by Intermarine personnel, close coordination with the Terminal operator in Honduras, Hyde Terminals, and continuous follow-up. Our Technical Department commissioned bathymetric studies that showed the draft during the approaches to French Harbor, Roatan, and the actual draft alongside the terminal. The