Case Study

Portsmouth Naval Shipyard ME- V2

Portsmouth Naval Shipyard ME- V2

Pages 2 Pages

PORTSMOUTH NAVAL SHIPYARD, ME CASE STUDY COMBINED HEAT AND POWER PLANT ENERGY SAVINGS PERFORMANCE CONTRACT OPERATIONS AND MAINTENANCE MICROGRID FAST LOAD-SHED AND ENERGY STORAGE SYSTEM TECHNOLOGY TYPE FACILITY SIZE 4 MILLION SQ FT $ 44 MILLION PLUS $3.6 MILLION DOD GRANT 10 MW WINTER 5 MW SUMMER, 14 MW EMERGENCY ESPC ENERGY PROJECT SIZE CAPACITY ANNUAL SAVINGS (2016): $ 6,200,000For the full story, visit: ameresco.com SUMMARY The U.S. Army Corps of Engineers and the U.S. Navy selected Ameresco to design and install three comprehensive energy conservation projects under an Energy Savings Performance Contract (ESPC), as well as a microgrid solution funded by a grant to demonstrate islanding capabilities which eliminates downtime during a loss of the electric public utility at Portsmou

Join for free to read