POPPET VALVE ASSEMBLY PROJECT SOLVES RTO RELIABILITY ISSUES POPPET VALVE PROJECT A quasi-municipal, industrial wastewater treatment facility in the Southwest asked PolSys Services for a solution to improve the on-stream reliability of two Regenerative Thermal Oxidizers (RTOs) at their facility. Although the plant is required to operate continuously, their systems were shutting down multiple times a week in some cases - causing major operating and environmental compliance issues for the plant. O P E R A T I N G I S S U E P R O J E C T S O L U T I O N A PolSys Senior Field Service Engineer visited the site to meet with the Facilities Manager, perform an inspection, and speak with plant personnel to gather as much information as possible about the shutdowns. After a comprehensive internal an