Case Study

Pond sediment removal with Mini Dredge

Pond sediment removal with Mini Dredge

Pages 3 Pages

Pond sediment removal with Mini Dredge November, 2011 Volume 300 Objective This pond had accumulated silt over time which needed to be removed as part of a remediation pro- ject. The contractor in charge of the remediation selected a Pirana Mini-Dredge to remove the silt and WaterSolve LLC was contracted to install and operate a Geotube® dewatering system to con- solidate the material. The objective was to economically remove the silt from t

Join for free to read