Case Study
Polypropylene - Cold Temperature Installation
Polypropylene - Cold Temperature Installation LOCATION: Northwest Territories TIMEFRAME: Winter-Spring 2001 & 2002 SCOPE OF WORK: Supply, fabricate & install 32,000m2 of 40 mil polypropylene for collection dam PROJECT PARTNERS: Owners: BHP Diamond Mine Engineer: EBA Engineering Consultants Ltd. Contractor: Lay eld Environmental Project Name: EKATI Diamond Mine, Misery Site Dams Owner: BHP Diamond Mine Locaton: Canadian Arctic Engineer: EBA Engineering Consultants Ltd., Edmonton, Alberta Materials: 40 mil Polyproylene geomembrane, GCL, non-woven geotextile During the winter and spring months of 2001 and 2002, Lay eld was involved in the supply, fabrication, delivery and installation of over 32,000m2 of 40 mil polypropylene for the King Pond Dam, Waste Rock Dam and Seepage Col