Case Study
Polyglass for bridges
Case study: Polyglass for bridges Winter maintenance for railway bridge. Customer Structural industry, UK. Application date February 2001. Scope of work Assess work required on severely corroded railway bridge. Refurbish, maintain and protect railway bridge back to safe working condition. Products Corrocoat ZIPCOAT. Substrate Mild steel. Coating system • Grit blasted to SIS 05 5900, SA 2 1 /2 (Relate to Corrocoat data sheet SP1, 6/30). • Zipcoat