Case Study

Polish CEMEX cement plant relies on WEIMA - WEIMA Maschinenbau

Polish CEMEX cement plant relies on WEIMA - WEIMA Maschinenbau

Pages 7 Pages

Polish CEMEX cement plant relies on WEIMA - WEIMA Maschinenbau Two WEIMA PowerLine 3000 single-shaft shredders with a powerful hydraulic drive used in secondary shredding absolutely take center stage here. The main buyer of the produced Refuse Derived Fuel (RDF) is CEMEX, whose cement production is located directly in the adjacent building. In order to meet the demands of the ambitious project, one WEIMA PowerLine 3000 single-shaft shredder, including sorting and separation systems, was initially commissioned. The demand for high-quality Refuse Derived Fuel, however, grew quickly and soon exceeded the quantities produced at the plant. not more than a year passed before EkoPaliwa finally doubled its capacities and purchased another WEIMA PowerLine 3000 shredder with 350 kW drive capacity. T

Join for free to read