Case Study
Polar Fresh and Coles
Polar Fresh and Coles Chilled Distribution Centre NuGreen Solutions has completed a major LED lighting project for Coles / Polar Fresh at their 40,275 sqm Chilled Distribution Centre, Eastern Creek, NSW. Coles / Polar Fresh understood the importance of using NuGreen’s latest LED High Bay lighting solution which ensures long term operational efficiency, 70% lower energy consumption with 16,800 tonnes of carbon emissions abated and the security of a long term maintenance free warranty. THE BENEFITS Energy 70% projected savings on current lighting spend 7yrs Maintenance free period for LED High Bay lighting C02 16,800 tonnes of C02 abated over the next 10 years THE SOLUTION • Lighting redesign and LED specification • Initial audit and consultation •