Case Study
Plymouth Ferry Port
Rust meets Fast Flash Fast Flash edge detail Completed tank at the dock Case Study – Plymouth Ferry Port Edge detail in a flash with Fast Flash ® Paul Rosevear with 30 years of experience in the roofing industry has completed a unique project at Plymouth Ferry Port. The project involved three steel oil tanks with an ongoing issue of corrosion due to their exposed location at the port. Paul was asked to find a solution for protecting the top edge detail of the middle oil tank. Originally the detail was painted, however this did not have the durability needed for the corrosive marine atmosphere. The other factor that needed to be considered was the flammable nature of oil, which meant the application of the product to the tank could not involve any form of heat or flames. After a succe