Case Study
Plumbing Equipment
Plumbing Equipment Application Plumbing Equipment. Challenge A plumbing equipment manufacturer was developing a restroom that required the automatic injection of water into its “P” traps. This system was designed to maintain the barrier between sewer gasses and the restroom enclosure. The plumbing equipment manufacturer was experiencing leakage problems with the injection system’s valves and late deliveries from the valves’ supplier. The restrooms were often located in remote wilderness areas, were di?cult to service, and frequently had no access to electric service. The company needed highly reliable valves that could run on low power. Results In the past, the plumbing equipment producer had experienced virtually no failures or warranty claims with Emerson’s ASCOTM products. Base