Case Study

Planned Shutdown Shaves Seven Days From Schedule

Planned Shutdown Shaves Seven Days From Schedule

Pages 1 Pages

www.kepner-tregoe.com Copyright © 2014 Kepner-Tregoe, Inc. All Rights Reserved. KL706.b 700-10-P356508 CHALLENGE A premier steel long products manufacturer and metals distributor actively seeks ways to maintain its strong market position and fulfill demand for product. While planned shutdowns produced satisfactory results at its steel mills, the company was determined to do better. By reducing the length of time of an upcoming shut, a key ste

Join for free to read