Case Study
Pipeline Track Twin Bridge Replacements
The Project Client: Hobart City Council Value: $170,000 Completed: April 2015 10b Industrial Drive PO Box 812 Ulverstone TAS 7315 Phone: (03) 6425 6530 Fax: (03) 6425 6112 Email: info@vec.com.au www.vec.com.au ABN 42 067 541 879 Pipeline Track Twin Bridge Replacements The narrow two pedestrian bridges (12m and 18m in length) were to be replaced with structural steel construction. The scope of works for this contract included the provision of plant, labour and materials required for the structural works outlined in the contract drawings. This includes but is not limited to: • Partial demolition and removal of existing bridges; • Construction of new bridges; • Supply and installation of steel components including beams, supports and handrails; • Supply and installation