Case Study

Pinewood Studios

Pinewood Studios

Pages 1 Pages

CaseStudy Buildings We supplied three gutter-linked 525sqm buildings, plus another 2,400sqm temporary building, all of which were erected this Spring. Each had uPVC walling, roller doors and thermo roof and gables to increase insulation and reduce condensation. Outcome With the buildings now erected on site and production companies moved in, Pinewood now has more temporary space than ever before, comprising of more than 8,000sqm – rough

Join for free to read