Case Study

Pine Ridge

Pine Ridge

Pages 3 Pages

Pine Ridge July 2009 By any measure, the new Inland Aggregates Pine Ridge plant is a massive operation. What’s more impressive still is the schedule with which the plant was conceived, designed, constructed, tested and commissioned. From a simple desire in early 2005, to a fully operational 1100 tonne-per-hour plant in mid 2008, the Pine Ridge facility proceeded at an enviable pace, and now sits as one of the premier aggregate operation

Join for free to read