Case Study
Pile Fuel Cladding Silo
www.cavendishnuclear.com July 2019 Customer: Sellafield Limited Site: Sellafield Value: £600 Million Duration: 2011 -2021 Capabilities: Design and Engineering Manuf ac ture Assembly T est Install and Commission Cavendish Nuclear was tasked with delivering plant and equipment capable of accessing historic Intermediate Level Waste in legacy Pile Fuel Cladding Silo (PFCS), removing it and transferring it into containers for safe interim storage. The project covered the entire lifecycle: from detailed design through to manufacture, works testing at our Rosyth testing facility, transportation to Sellafield, installation and commissioning. A truly collaborative project delivered three years ahead of schedule. 3 years ahead of schedule with a cost