Case Study
Pharmaceutical Company, Huddersfield
CASE STUDY 01484 715400 info@accflooring.co.uk www.accflooring.co.uk Unit 1a Woodvale Workshop, Thornhill Beck Lane, Brighouse, West Yorkshire, HD6 4AH. Pharmaceutical Company, Huddersfield A long standing client of ACC Flooring asked if we could carry out works to a number of areas during their shutdown period in between Christmas and New Year. Some of the works was required due to health and safety issues and some was essential remedial work to production areas. All the works had to be completed prior to their commencement of production immediately after New Year’s Day. The concrete substrate to all the areas were mechanically prepared with enclosed diamond grinding equipment prior to the installation of any flooring system. A polyurethane concre