Case Study

PFLNG SATU External Turret

PFLNG SATU External Turret

Pages 1 Pages

Scope of Work SOFEC will design, construct, fabricate and deliver an external mooring system complete with anchor chains and anchor piles. The SOFEC external mooring system will be DNV classed. General Description Client Name: Petronas FLNG-1 Contract Award: December 2012 Installation Date: Planned for 2016 First Oil: Planned for 2016 Vessel Size: 1.2 MTPA LNG Process Capacity: 230 MMSCFD Water Depth: 77-200m (252.6-656 ft) Fabrication: Tur

Join for free to read