Petros PACE Finance Helps Madison Equities Cut Energy & Operating Costs by 40% CASE STUDY: MADISON EQUITIES Project Highlights THE FUTURE OF C-PACE FINANCE • THE CERTAINTY OF CLOSE $10.2 Million C-PACE Loan $27.6 Million Cumulative Savings $1.4 Million Annual Savings THE NEEDS • HVAC upgrades with controls • Variable frequency drives • Efficient lighting with controls • Air handling units • Chillers and boilers Madison Equities needed to make upgrades to three of its premier properties. These properties all had costly and out of date mechanical systems approaching the end of their useful life and causing an increase in operating and energy costs. THE CHALLENGE THE SOLUTION C-PACE fin an cin g enabled compreh en sive improvements, ensuring that all three buildings would be energy effic