Case Study

Petrobras Albacora

Petrobras Albacora

Petrobras Albacora Brazil Project Overview Contract Award: 1986 (Trees Ph I) 1992 (Trees Ph II) 1994 (Manifolds Ph I) 1995 (Manifolds Ph II) Sales: Rio de Janeiro, Brazil Fabrication: Rio de Janeiro, Brazil Service Base: Macaé, Brazil Host Type: Semi and FPSO Contract Type: EPC Project Characteristics No. Trees: 65 (25 by FMC) Water Depth: 150 - 1,050 m (490 - 3,440 ft) Tree Type: Vertical Tree Pressure 5,000 psi Tree Bore

Join for free to read