Case Study

Perfection from A-Z

Perfection from A-Z

Pages 1 Pages

SUCCESS 050.6208 090.5783 050.6207 050.6206 050.6205 050.6209 Reichle & De-Massari AG | www.rdm.com CONN CTIONS 10 I2015–49 From the outset, the building was to be fitted out to a high standard, including a future-proof communication infrastruc- ture. The owner set great store by sus- tainability. The buildings were construct- ed to comply with the Minergie standard, warm water being generated by a ground-water heat pump. Electrici- ty is g

Join for free to read