Case Study
Pelabuhan Tanjung Pelepas (PTP) Wharf Structures Berth 13 & 14: Cementaid’s 3CC System
Project Page: Pelabuhan Tanjung Pelepas (PTP) Wharf Structures Berth 13 & 14 Pelabuhan Tanjung Pelepas (PTP) Wharf Structures Berth 13 & 14 The Port Pelabuhan Tanjung Pelepas (better known as PTP) is a major hub in Southeast Asia, and has a capacity of 8.4 million, twenty-foot equivalent unit (TEU) per year. The Problem Unfortunately, the previous 12 operational berths which are continuously exposed to seawater has been a constant concern to the PTP maintenance department. The Solution In view of the recurring maintenance problems plaguing the existing marine concrete structures, the Consultant, AECOM which was commissioned to provide multi-disciplinary consultancy services for the detailed survey, engineering design and supervision of wharves for the development of Phase 2: Berth 13 & 1