Case Study

Patient Care at HealthEast Bethesda Hospital requires Accurate Clocks

Patient Care at HealthEast Bethesda Hospital requires Accurate Clocks

Pages 1 Pages

Case Study Patient Care at HealthEast Bethesda Hospital requires Accurate Clocks The parapet at the HealthEast Bethesda Hospital is the highest point in all of the 7 county metro areas of Minneapolis and St. Paul. “You can look out the window and see straight into downtown Minneapolis. The view is incredible” said Kevin Johnson in Facility Maintenance. Built in 1931, the hospital sits on 8.5 acres overlooking the banks of the Mississippi River. Bethesda Hospital had an ongoing problem with their clocks for a number of years. And with close to 350 clocks, this was no small problem. “To be honest, it was a real pain in the butt”, according to Larry Johanson, Senior Lead Engineer. “Who has time to fool around with maintaining or repairing hundreds of clocks? We have so many things to work

Join for free to read