Paseo Del Mar
Paseo Del Mar Location: San Pedro, Calif. Pipe Used: 36-inch IPS DR 21 HDPE Quantity of Pipe: 300 feet Type of Project: Bypass lines to replace 96-inch concrete pipe washed into the ocean by heavy rains. Two 150-foot-long HDPE lines, selected for their water-tightness and flexibility, were connected to the concrete and run side by side down the steep slope for storm water drainage. Duration of Project and Pipe Installation: November 2011