Challenge: Provide an independent budget analysis to the Canadian Parliament on the estimated cost to build six-to-eight Artic/Offshore Patrol Ships (A/OPS). The A/OPS conceptually feature an unprecedented hybrid design between ice breakers and open ocean vessels, negating both estimate by analogy because of insufficient comparable data and bottom-up estimating for lack of detailed information. Solution: Parametric estimating with PRICE® TruePlanning® cost modeling software and supporting PRICE Systems methodology expertise to determine costs using high-level descriptors (ship size, weight, technology, engineering complexity, etc.) and historical shipbuilding costs. Results: The PBO’s independent analysis found that only four ships could be delivered within the project’s budget an