Case Study

Panorama at the Pellegrin Hospital Group

Panorama at the Pellegrin Hospital Group

Pages 4 Pages

The Pellegrin teaching hospital before the project Since the development of the Tripode complex in the 1970s, supervision of the technical installations has been very challenging. The 13-floor building with 3 wings thwarts security and hygiene. Today hori- zontal architectural de- signs are predominant, on only two to three lev- els. With 27 hectares (66 acres) of floor space in use and employees repre- senting over 1,000 differ- ent t

Join for free to read