Case Study

Palenque CALM

Palenque CALM

Pages 1 Pages

Scope of Work SOFEC designed, constructed and delivered a replacement CALM for crude oil import. General Description Client Name: Shell Contract Award: June 1984 Installation Date: May 1985 Application: Crude Oil Import Project Specifications Water Depth: 25m (82ft) Tanker Size: 100,000 dwt Dimension: 10.5mØ x 4.0m Floating Hose: 2 x 16-in. Underbuoy Hose: 2 x 16-in. Chinese Lantern Hawser System: Unavailable Anchor Leg System:

Join for free to read