Case Study
Padmount Sectionalizing Cabinets
Padmount Sectionalizing Cabinets Case Study Solution For a more aesthetically pleasing solution, the utility decided to feed the new roadway area underground instead of replacing the overhead lines. Because of the problem history of that location and to minimize the cost and construction disruption of creating new vaults, the utility decided to install padmount sectionalizing cabinets utilizing three, 3-position junction bars. Each circuit was terminated into separate padmount enclosures which were positioned adjacent to each other. A tap was incorporated to feed local area loads. The padmount sectionalizing cabinets provide a clean solution with easy access by operating personnel if circuit isolation is required. Challenge A road expansion project mandated the removal of numerous