Case Study

Overtrawlability trials of a subsea structure

Overtrawlability trials of a subsea structure

Pages 2 Pages

The problem Our client required a study of the interaction between a protection structure for a wellhead and shing gear. The structure had a protruding feature, which was designed to protect a tiein location for a number of months before the pipeline was connected to the manifold. The nal design had to meet the Norsok U-001 guidelines on overtrawlability. The solution We developed a scale model of the protection structure and a test procedure based on the client’s shing gear interaction studies. Preliminary tests identied a minor snagging feature. We then re- designed the structure to avoid catching, before the ume tank trials. Once the re-design had been implemented, scale model tests of trawl gear and nets passing over the structure were run at the ume tank. These were lmed on thr

Join for free to read