Case Study

Over 18% output increase with the addition of Citadel-BioCat+™ at the Panvita Jezera Plant in Slovenia

Over 18% output increase with the addition of Citadel-BioCat+™ at the Panvita Jezera Plant in Slovenia

Pages 2 Pages

1 11 2 12 3 13 4 14 1 11 2 12 3 13 4 14 Citadel e nvironmental Solution S HENRY MADDERS, DIRECTOR // +44 7832 384223 // henry@citadel-biocat.com RAY LONG, MANAGING DIRECTOR // +44 7825 248884 // ray@citadel-biocat.com CONTACT Decos-re d.o.o can be contacted at: biocat@decos-re.eu Installed Power: 999 kW with 2 Digesters in Series D1: 3.500 m 3 D2: 2.000 m 3 Feedstock: Maize Silage, Pig Slurry, Maize Whole Corn (below 10% of total oDM) Feed mix as follows: MAIZE SILAGE PIG SLURRY CORN January 35,1t 53m 3 0,83t Feed equates to 39-40 tons of Maize Silage per day. February

Join for free to read