Case Study
Organica Solution Provides Payback With Reduced Sewer Network Costs
CHALLENGE Wastewater service providers regularly face challenges with aging sewer infrastructure, unable to handle the increased load of growing communities. Overloaded sewer mains frequently rupture, requiring costly repairs or replacement, while causing serious inconveniences to affected neighbourhoods. A local wastewater utility in the state of Oregon (United States) contemplated replacing a 20,000-foot interceptor sewer pipe that forms