Case Study
ORCA for WBM: Restoring production of a well following a long-term decline, offshore West Africa
ORCA for WBM: Restoring production of a well following a long-term decline, offshore West Africa “We wanted to signi?cantly improve production within our equipment constraints. Coiled tubing was not available at the time. Also, it was extremely important to us that the clean up method we used was low hazard. Our operations were far from the nearest hospital and we were not comfortable with using hydrochloric acid. ORCA for WBM gave us the r