Case Study

Oracle MPK To SCA Phase II Campus Move

Oracle MPK To SCA Phase II Campus Move

LLC Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 Oracle MPK to SCA Phase II Campus Move Santa Clara, CA 2011 30,000 Two office buildings on the old Sun Campus were converted to high density rack and bench labs. The total new IT load was about 5 MW. An existing chilled water plant on campus was expanded from 2000 to 5000 tons to serve the new loads. Full design and

Join for free to read