OPW Simplifies BP Fuel Delivery and Site Builds with New Fibrelite Sump and KPS Piping

OPW Simplifies BP Fuel Delivery and Site Builds with New Fibrelite Sump and KPS Piping

Pages 2 Pages

BP, UK OPW Simplifies BP Fuel Delivery and Site Builds with New Fibrelite Sump and KPS Piping Project Overview Solution Problem BP approached OPW to provide a simple fill solution for a selection of their UK sites. In response, OPW developed a new range of Fibrelite GRP below ground remote fill systems. OPW developed their existing range of Fibrelite below ground remote fill systems to incorporate a sump and offset corbel with alternate pipe exit positions in line with BP’s requirements. The new sump and corbel utilised some items from the existing product range to deliver a unique while cost effective solution. This new product was made available in line with the start of the new construction programme. The new below ground remote fill systems are factory fitted with dual c