Case Study
OptiPort System Reduced Footprint, Saved Time, and Increased Daily Production by 100%
Results n Increased daily gas production rate by 100% after 50 days compared to an identical well with perf-and-plug completion n Produced 61% more gas in the first 90 days, worth an estimated USD 1,457,200 n Increased EUR 107% n Reduced required HHP by 60% n Decreased footprint, time to complete, operations cost, and HSE risks Challenges n Operator wanted a solution to increase operational efficiency and reduce cost n Two simi