Optimum Switch: Data Centres

Optimum Switch: Data Centres

Pages 2 Pages

Optimum Switch: Data Centres Programme 2000 - Ongoing Sectors Technology Client Global Switch / Capgemini Appointments Architecture, Structural and Civil Engineering & Mechanical and Electrical Engineering Optimum Switch is a building system designed to improve the speed and accuracy of switch centre construction, reducing capital andfacilities management costs. Factory assembled modules are interconnected to form a central or perimeter corridor containing all primary power and cooling. Flexible secondary service units combine with the module to form the complete interior t-out. The rst Switch to incorporate the Optimum Switch System was Madrid. Seven modules were manufactured in Hull and shipped to Madrid for installation. Installation, by hoist and air skates, was completed in two days