Case Study
Optimizing natural gas transport
Gasunie Deutschland, a long-distance pipeline operator of natural gas, needed to have its aging control systems updated. After 19 years, six ABB Contronic P and one Advant System were scheduled for an upgrade to ensure continued reliable operation of Gasunie’s seven compressor stations. The migration was scheduled in two phases starting with the operator level and controllers first and then the I/O level. “The Freelance System is ideally su