OPTIMIZE TURNAROUND BUNDLE SCOPE USING BUNDLE RBI
Corporate Headquarters 20600 Chagrin Boulevard, Suite 1200 Shaker Heights, OH 44122 www.EquityEng.com For More Information: Valerie Magyari P. 216.658.4744 E. VMagyari@EquityEng.com RBI: CASE STUDY PROBLEM A petroleum facility requested that E 2 G | The Equity Engineering Group, Inc. perform a bundle RBI analysis and create and inspection plan to help optimize their TA scope. The analysis goal was to determine the risk of each bundle and outline which bundles needed inspection/replacement based on acceptable risk limits. CALCULATION BACKGROUND • The Bundle RBI methodology determines the risk at various times in the future. Critical dates considered are the RBI Date and the 1 st and 2 nd upcoming TAs. • Risk is compared to an acceptable risk target. If the risk exceeds this target