Case Study
Optimising Waste Dump Sequencing
www.maptek.com CASE STUDY Planning engineers are also responsible for defining the shape and optimum physical location of waste dumps and other necessary works for the normal development of the mine. Strategic planning establishes an extraction sequence which the operation aims to meet using the long term planning information. However, the sequence of filling the waste dumps is rarely set in these plans, or at least not done with enough