Installation can be done during winter The mounting structure is based on ballast, so no penetration of the water barrier The mounting structure is modular and can be assembled without heavy equipment April 2015 City of Espoo Espoo, Finland 60°11’25.4”N 24°44’22.7”E South, 15° 24 kW p 22.000 kWh 163 m 2 96 Naps Saana 250 MAW 250 W p 6” polycrystalline silicon cells Floating Hilti MSP mounting structure on flat roof SolarMax 13MT2 2 Opinmäki cam