Case Study
Operators Save More Than USD 430,000* on Difficult SAGD Well
Bene? ts ? Longer run life and less downtime ? Fast 27-day payback ? Deferred production savings of USD 283,050 per workover ? Increased production in high- temperature application ? Reduced environmental risk Challenges ? Steam Assisted Gravity Drainage (SAGD) well in harsh conditions ? Reduce number of workovers ? Decrease downtime and increase run life Baker Hughes Solution and Results ? Baker Hughes extreme temperature electrica