Case Study

Operations, Monitoring & Maintenance

Operations, Monitoring & Maintenance

© 2016 Aegion Corporation Operations, Monitoring & Maintenance Project: A 46/42/34” diameter BTC pipeline carrying crude oil from the Caspian Sea in Azerbaijan, through Georgia to the port of Ceyhan in South Turkey on the Mediterranean, totaling 1768 kilometers (443, 249 and 1076km). A 42” diameter SCP pipeline carries natural gas from the Caspain region through Azerbaijan and Georgia into Turkey and as such follows the same pipeline corridor

Join for free to read