Case Study
Open University Milton Keynes - Lightning Protection
Open University Milton Keynes - Lightning Protection In addition to the full maintenance package Churchill conduct at the Open University, a full BSEN62305 Lightning protection design supply and installation was required for ?ve buildings located on the Milton Keynes campus. This was successfully secured as part of a competitive closed bid tender directly to the University. The Solution This was a full turnkey project from design and risk assessments through to excavation and reinstatement of ground, equipotential bonds to main earthing and surge protection. Churchill’s SHEQ team where responsible for CDM to the satisfaction of the University’s health and safety management and the site was fully occupied and operational throughout the contract. Emphasis was also placed on hiding the condu